Table of Air Conditioner Installation Standard Service Fees and Equipments Type of Installation products | Installation Service Fee(VAT inclusive) | Standard equipment for installation (not exceeding) | New unit | Replacement of Old Unit / Relocation | VAF Electric wire | THW Ground wire | Breaker + box | Waste water pipe PVC Gray color | Chemical solution Duct size 0.7 mm. with insulation | Rubber 4" for setting up condensing unit | Equipment for wall repair | 1.Air conditioner size 9,000 - 13,000 BTU | Free | 3,200 | 2x2.5 Sq.mm. 8 m. | 1x1.5 Sq.mm. 4 m. | 20 Amp. 1 set | 3/8 4 m. | 4 m. | 1 set | 2.Air conditioner size 13,001 - 18,000 BTU | Free | 3,200 | 2x4 Sq.mm. 8 m. | 1x1.5 Sq.mm. 4 m. | 32 Amp. 1 set | 3/8 4 m. | 4 m. | 1 set | 3.Air conditioner size 18,001 - 24,000 BTU | Free | 3,700 | 2x4 Sq.mm. 8 m. | 1x1.5 Sq.mm. 4 m. | 32 Amp. 1 set | 3/8 4 m. | 4 m. | 1 set | 4.Air conditioner size 24,001 - 35,000 BTU | Free | 3,700 | 2x6 Sq.mm. 8 m. | 1x1.5 Sq.mm. 4 m. | 32 Amp. 1 set | 3/8 4 m. | 4 m. | 1 set | 5.Air conditioner size over 35,001 BTU | Free | 5,000 | 2x6 Sq.mm. 8 m. | 1x1.5 Sq.mm. 4 m. | 32 Amp. 1 set | 3/8 4 m. | 4 m. | 1 set |
Service Conditions 1.Terms on Installation - In case of having an installation on any glass block, mirror, metal,wooden furniture, and any kind of stone, there will be a cost for extra installation equipment from the standard as indicated in the Extra Installation Equipment Price List.
- In case of drilling a plastered ceiling, the company will drill at the area related to an installation (exclusive of paint and ceiling repair)
- Working site must be a flat surface of 2-3 square meter with a height from floor to the machine not higher than 3 meters.
- In case that the height from floor to the machine is higher than 3 meters, the customer must provide scaffold for installation.
- In case that the installation cannot be made because the customer does not prepare installation site or does not postpone the installation appointment 2 days in advance, the company will charge travelling cost of 300 Baht/ trip.
2.Terms on Installation Equipment - Electric wiring and water piping will be exposed.
- For standard installation equipment, the company will provide for actual usage only.
- The company reserves the right not to deliver those unused equipment and neither to exchange nor refund in cash or discount.
In case the customer purchases extra installation equipment himself, the company will charge labor cost at 50% of the extra installation equipment cost. ** No labor cost charge in case of using extra installation equipment which is given together with the products. The above cost of extra installation equipment is inclusive of VAT.
3.Installation Warranty * The Customer hires or engages technician of the company to work beyond the scope of service as indicated in the job sheet, without an engagement through the company. If the customer is interested in using any additional service, please contact Special Service Counter or Service Center at Tel.1284 4.Service Area Service radiance is as follows: Bangkok Branches cover Bangkok and Metropolitan Bangkok. - Rungsit Branch :up to Klong 10, Amphoe Banhpra-in, Wongnoi.
- Rattanathibej Branch :up to Nobprawong section.
- Phetkrasem Branch :PuttamonthonSai 7.
- Rama2 Branch :up to Prasamutjaedee, Pomprajul, Mahachaimuangmai.
- Suvarnabhumi Branch :up to Samutprakarn Clock Tower, Crocodile Farm, Bangna-Trad km.30, Bangplee Housing.
- Fashion Island Branch :up to Hua-TakayBridge, Suwintawong, Nongjok.
*Upcountry Branches - Free of charge for the first 30 kms. From the branch.
- 15 Baht/km for the following 31stkms.-100thkms
- Lump Sum service charge if exceeding 101 kms.
** The company reserves the right to change service fee and conditions without prior notice. Extra Installation Equipment Price List | List of equipment | Unit | Equipment price+ Labor cost INC VAT. | 1.Electric wire VAF 2x2.5 Sq.mm. | meter | 30.- | 2.Electric wire VAF 2x2.4 Sq.mm. | meter | 50.- | 3.Electric wire VAF 2x6 Sq.mm. | meter | 70.- | 4.Ground wire THW 1.5 Sq.mm. | meter | 10.- | 5.Breaker + box | set | 150.- | 6.Chemical solution Duct 1/4 “ - 5/8” + with insulation | meter | 400.- | 7.Chemical solution Duct 6/8” + with insulation | meter | 650.- | 8.Chemical solution Duct 7/8” + with insulation | meter | 750.- | 9.PVC duct size 3/8" grey color | meter | 40.- | 10.Breaker Haco 32A + box( 3 Phases ) | unit | 1000.- | 11.Rubber 4" for setting up condensing unit ( additional installation from the standard) | set | 200.- | 12.Track for coveringchemical solution duct #75 (including joint in area of 1 m.) | meter | 300.- | 13.Track for covering electric wire #4, Plastic | meter | 70.- | 14.Metal hanger for hot condensing unit, cold condensing unit | set | 500.- | 15.Metal hanger for hot condensing unit, basket pattern | set | 900.- | 16.Filling cold refrigerants gas #R22 | pound | 30.- | 17.Filling cold refrigerants gas # R32A | pound | 30.- | 18.Filling cold refrigerants gas #R410A | Kg. | 750.- | 19.In case air conditioner's location ,model: INVERTOR, is changed (filling cold refrigerants gas R410A) | Kg. | 750.- | 20.Equipment for ceiling repair size 3" (additional charge from standard) | unit | 80.- | 21.Ground Rod 30 cm. | point | 200.- | 22. Gouging wall work, any kind of terrazzo floor | point | 2,500.- | 23. Gouging wall, wooden floor, fiber works | point | 1,000.- | 24. Metal supporting carrier for glass wall, glass block, metal | set | 1,000.- | 25. Gouge, drilling, ceiling repair (excluding painting) | point | 300.- | 26.Cost of demolishing old machine | set | 750.- | 27.Ariflow Diurter | unit | 1,000.- | 28.Cost for providing scaffold having its height nor more than 5 meter | meter | 2,000.- | 29.Cost for providing scaffold having its height 6-8 meter | meter | 3,000.- | 30.Curcuit Breaher 32 A | unit | 300.- | 31. Ceiling Repair | sqm. | 1,000.- | 32.Syphon | unit | 2,500.- | 33.PVC pipe 3/8” – 3/4” white | meter | 70.- | 34.In case the customer purchases extra installation equipment himself, charge for labor cost | 50% of the Equipment Price + Labor Cost |
The company has a procedure to confirm appointment and survey customer satisfaction in using the service in order to improve service quality. Therefore, there may be more than one contact to the customer.
|